Our Works

Our Work Transforms Businesses and Communities

King Hussein Cancer Center Healthcare Facility

LEED v4 BD+C, for Healthcare

KHCC Aqaba Outpatient Project is designed and to be constructed to meet Silver level certification under LEED v4 BD+C, for Healthcare mandatory prerequisites and optional targeted credits needed for the works to obtain a minimum LEED Silver based on the LEED requirements identified by the project team. Total built up area of the project = (6670 m2). The Project is located in Aqaba at the south of Jordan. In Aqaba, the summer is long, sweltering, arid, and clear and the winter is cool, dry, and mostly clear. However, the climate condition has been a major factor in the design of the building and is of high consideration for the construction sustainability strategies.

Dubai School Building

Al Sa’fat Standard Requirements

The project is a three story multi-disciplinary school building located in Dubai
with various space use functions such as laboratories, staff rooms, clinics gymnasium, and an indoor pool, and with a total GFA of (29,154 m2) The project targeted to achieve Al Sa’afat, showcasing its commitment to environmental stewardship and promoting a healthier built environment for a school building.

King Hussein Business Park Office Building

  • Total Energy Efficiency Percentage = 50.82% which demonstrates “EDGE Advanced” level
  • Total Water Efficiency Percentage = 37.21%
  • Total Material Efficiency Percentage = 22.94%
  • Final Energy Use= 50,440 kWh/month
  • Final Water Use= 1,357 m3/month
  • Final Operational CO2
  • Emissions= 20.23 tCO2/month
  • Final Embodied Energy= 1,085 MJ/m2
  • Final Utility Cost= 7,817 USD/month
  • Subproject Floor Area= 10,545
  • Energy Savings 673.83 MWh/Year
  • Water Savings= 9647.16 m2
  • Operational CO2 Savings= 245.73 tCO2/Year
  • Embodied Energy Savings= 2924.97 GJ
  • Utility Cost Savings= 0.09 Million JOD/Year
  • Base Case EPI= 122.00 KwH/m2/Year
  • Improved Case= 58.00 KwH/m2/Year

307 Brock Street South, Whitby Residential Building

Whitby Green Standard 2023

The project entails the construction of a G+9 mixed-use building, featuring a total gross floor area of 21,000 m2. The ground floor is designated for retail spaces, indoor amenities covering an area of 715 m2, and several residential apartments. The upper floors exclusively accommodate residential apartments. Surrounding the building are outdoor amenities designed to cater to the needs of the building’s residents.

Noteworthy features of the building include green roofs integrated at multiple levels, underground parking facilities with dedicated spaces for bicycle racks, and waste chute vents distributed across all levels. Waste from these chutes collects at a centralized waste collection and segregation room.

The design prioritizes energy efficiency, incorporating the most effective measures. It adheres to the Whitby Green Standard – Tier 1, with additional considerations from Tier 2 to enhance sustainability and contribute to the creation of a greener and more aesthetically pleasing structure.

Airport Building

The Oshawa Executive Airport is operated by the City of Oshawa. The airport terminal was built in 2006.
The envelope is composed of a significant number of window panels. The project was to upgrade the building envelope in order to ensure energy efficiency and elimination of losses. Enhanced HVAC systems were designed and installed along with upgrades to the building envelope itself. Additionally green buildings principles were implemented to enhance the sustainability of the building.

AJNB- UNON New Office Buildings

LEED Gold Level Certification

  • The Buildings were designed to achieve Net-Zero
  • Some featured measures :
  • – On-site renewable energy: PV-system
  • – 100% outdoor water reduction through stormwater collection
  • – 35% indoor water reduction using water efficient fixtures
  • – High performance lighting systems
  • – Dimmable indoor lighting fixtures
  • – Natural Ventilation
  • – Bicycle racks and shower room
  • – Daylight penetration with sDA350,50% exceeds 90% of the spaces – Quality views exceeds 90% of the R.O.S
  • – Outdoor materials selection to reduce the Heat Island
  • – Low Emitting Materials were prioritized in the selection
  • – Life Cycle Assessment targeting a reduction compared to a base case scenario

City of Oshawa Energy Management Plan

Adopted by the City Council as part of their Oshawa Strategic Plan Selected to receive an esteemed International Award (AEE’s Canada Region Institutional Energy Management Award for 2020) . Resulted in annual cost savings of $500K and GHG reduction of 750 tCO2. Implemented a 600 kW CHP project as per the plan, which results in ~$3M revenue for the City over 20 years. Attracted neighboring industrials and municipal counterparts, which expanded funding opportunities for more projects.